For Sale: Rebuilt Magtech Servo® & Inland Servo® Motors |
 |
Rebuilds include:
* New Bearings
* New Idler
* New Brushes
* 90 Day Limited Warranty
Fits Ultratech® models:
*900 *990
*1000
*1100
*1500
*1600
*1700 *1900 |
Order yours today!
Call ( 831 ) 722-7173 or
( 831 ) 722-7174
Voicecoil Theta Stage Rebuild |
| The UTS electronic focus system is incredibly reliable, but it is prone to occasional problems that affect overall machine performance.
- Separation of the actuator coil from the pod and loose connections for the voice coil and LVDT's can cause high focus system sigmas,
and other serious focus system errors.
- Wearing of the vee-bearing surfaces can cause loss of theta adjustment precision and disengagement of the theta drive link pin.
These can cause excessive z-mode drops and even wafer breakage during wafer pickup and drop off.
- Pop up chuck mechanism leaks. This critical mechanism can develop
leaks, which lead to focus errors and problems during frosty reticle
loads.
Being an extremely expensive assembly, the Voicecoil Theta Stage is a very
good candidate for refurbishment. KS Equipment can completely rebuild
the assembly, test its functionality on a 1100 or 1500 Stepper and
return it to your company guaranteed to function like new, meeting
or exceeding OEM specifications. Exchange units are available in many
cases. Call, or email us about this valuable service.
|
|
 |
 |